Dargavel Engineering Limited Consultant Engineers provide pipeline Pre-Commissioning and Commissioning for MOGS (Mellitah Oil & Gas B.V Libyan Branch) to the Sabratha Platform / Field
Bahr Essalam Gas and Condensate field phase II development. Phase II Project
- Development of the C Central A area and the C East area
- Upgrade of the Sabratha platform.
- C East area, two clusters, subsea facilities connected to the existing riser and J-tubes of the Sabratha Offshore Production Platform, Offshore Libya.
Pipeline pre-commissioning is the process of proving the ability of a pipeline and piping systems to contain product without leaking. This product may be liquid, gaseous or multiphase hydrocarbons, water, steam, CO2, N2, petrol, aviation fuel etc.
Pre-commissioning is the series of processes carried out on the pipeline before the final product is introduced. The process during which the pipeline is made “live” i.e. the product is put in the pipeline, is called pipeline commissioning or start-up.